The refurbishment of a concrete multi-storey car park. Removal of the old, failing, system and replacement with Deckmaster System-R car park deck surfacing system.
The refurbishment of a concrete multi-storey car park. Removal of the old, failing, system and replacement with Deckmaster System-R car park deck surfacing system.
• Produced by RESDEV Ltd in the UK under BS ISO 9001:2008 Quality Management Certificate Q09073
• BS EN 1504-2 Tested & Certified By The Building Research Establishment
• BSI Factory Production Control Certificate 0086-CPR-601605
• UK Track record going back over 18 Years
• BRE Assessment of Durability site investigation report 287055 states:
Deckmaster System R is “expected to have a service life of at least 20 years”